4 stops full cabin wheelchair platform project in the Philippines

Wheelchair platform is hydraulic system vertical platform lift with half or full cabin. Last month, one of our customer installed their 4 stops full cabin wheelchair platform in the Philippines. This is also Himor’s 22nd project in the Philippines. Here are the project brief details.

 

4 stops Wheelchair platform project specifications

Lift type: Full cabin vertical platform lift for wheelchair

Stops: 4 stops, including ground floor.

Total travel height: 10 meters

Clean capacity: 250 kg

Access direction: get through type access

Doors on cabin: 2 folding doors on access direction

Electric power supply: 220V, 60HZ, Single phase

Motor type: silent motor

 

Project process stage 1: Wheelchair platform lift specification discussion

In the date of March 8th, 2022, customer sent the detailed request of a 4 stops lift to our sales department. At the same time, our sales time asked a site drawing from customer to confirm the exact situation. After review the drawing, we confirmed a 4 stops and 10 meter travel height lift design. Finally, we offered quotation with drawing to customer for final confirmation.

 

Project process stage 2: Order process and finish production

Customer made payment to Himor Machinery within one week after the project was confirmed. Because each customer’s request is different, we need to customize according to the site electric input. For this 4 stops lift, the voltage we customized is 220V, 60HZ, Single phase. As we have material in stock, so we finished production in 25 working days.

 

Project process stage 3: Lift pre-install in workshop, test, and delivery

As long as we finished production, we assembled the lift in our workshop. Under the direction of the engineer, the workers put the equipment together and adjust it. The quality inspection department will carry out the final acceptance of the equipment after the completion of debugging. Acceptance work is not a simple inspection, need to do no-load test and load test. This step takes about 5 working days to complete. During the whole process, the sales staff in charge of the project will take pictures. Send pictures and videos to customers for confirmation after shooting. The sales department communicates with the customer about the transportation after the products have passed the inspection. Send the equipment by sea to Manila North Port, which is nearest to the customer.

 

Project process stage 4: Final install in site of the Philippines

After the lift arrived at the port, the customer entrusted the customs clearance agent company to carry out the customs clearance work. And moved the equipment to the site. According to the installation materials and drawings we provided to the customer, the customer completed the installation and commissioning of the equipment within 3 days. During this process, Himor’s sales department worked with the customer and after-sales departments to conduct some installation guidance. Below are some photos after customer installed the lift.

wheelchair platform
wheelchair platform

Any customers have request for such full cabin wheelchair platform, welcome to consult with our sales team. We will give you the most professional design and quotation. From pre-sale through production and installation, Himor’s services are always with the customer.